Project Description

Trench opening, Carrying of demolition product material, Pipe laying, Welding application, Application of interior and exterior coating, Preparation of bed, pre-capping and covering in compaction of first layer and second layer 90% proctor, Hydrostatic test

Project: proposed modification of the tank interconnection line

Lenght: 0+000 a 3+360 pipeline 36” 0+000 a 0+700 pipeline 36″

Start date: September2020